![]() A building permit application shall be submitted along with the sanitary sewer application (for sewer disconnection).Approval from DEP and Environmental Protection Agency ( EPA) are required before a demolition permit can be issued. This inspection must be done by someone who is licensed and certified by the Pennsylvania Department of Labor and Industry. The building must be thoroughly inspected for any asbestos-containing materials. Commercial and residential buildings will require the contractor or owner to contact DEP and the Federal Environmental Protection Agency prior to demolition.The permit fee is $35 (cash or check made payable to Lower Paxton Township) and add the $4.50 state fee.Signed “hold harmless agreement” with the Township.Copy of blasting license of those involved with the blasting as issued by Pennsylvania DEP.Copy of Pennsylvania’s “blasting activity permit” from DEP.Please review the forms carefully for further instructions.īlasting Contractors shall submit the following: A copy of the certification form shall be returned to the Township after closing. There is no fee for the application and certification form, however, there is a fee charged by the listed third-party inspectors for the wiring inspection. ![]() Smoke detectors for change of ownership for residential dwellings:īe sure to pick up the smoke detector application and certification form prior to the change of ownership.Licensing is not a requirement for commercial or residential work.The building permit application is also used for electrical, mechanical, and other types of work.Please note, the stormwater operations and maintenance agreement has been updated and is available for reference ( ) The plans shall include completion of a building permit, plumbing permit (if applicable), zoning and stormwater applications (if applicable).For more information see section 403.42a of the UCC.Commercial plans are required to be sealed and signed by a Pennsylvania Architect or an Engineer.A plot plan is required for new construction additions, pools, decks, etc.Residential and commercial plan submission shall include 2 sets of drawings. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |